The builders have packed up and the invoice’s paid, but you’re the one left staring down a post construction cleanup: dust everywhere, offcuts in the garden, a driveway covered in offcuts and debris. That’s the reality after almost every renovation we see across Prahran, Toorak and the inner-south. Before you book anyone in though, it’s worth asking one question: is this just mess, or is something actually wrong with the job? Plain mess is easy to sort. Unfinished or non-compliant work, or a builder who’s gone quiet, is a different problem altogether, and it needs a different first call.
Whose job is it: broom clean, custom, and contract obligation

A standard handover clean, sometimes called a broom clean, is the builder’s job. It covers sweeping floors, wiping surfaces and hauling offcuts, packaging and general site rubbish out of the way. Most contracts in Victoria include this as standard, so if your builder’s packed up and left sawdust, cut timber and empty tins behind without a broom clean, that’s on them to sort first, not you.
Where it gets murkier is anything beyond broom clean, like a full post construction cleanup with tile grout scrubbed, windows done and skirtings dusted. That’s often a separate line item, sometimes contracted to a specialist cleaner, sometimes assumed to be included when it wasn’t. If you’re not sure what your contract actually promised, it’s worth a read before you spend a weekend scrubbing something the builder should have covered.
Then there’s the harder question: is the mess sitting on top of work that isn’t actually finished, like exposed wiring, missing trims, or compliance items still open? That’s not a cleaning problem at all. Victoria’s domestic building consumer guide is the place to start working out what you’re owed.
Mess or defect: two different problems, two different fixes

Before you book anyone, work out which problem you’ve actually got.
If it’s offcuts, dust, packaging, and general site rubbish, that’s mess. It’s unpleasant, but it’s straightforward: a post construction cleanup sorts it, and the site is liveable again. That’s the part It’s Done is built for.
It’s a different problem if the mess is sitting on top of work that isn’t finished. Exposed wiring poking through a wall. Skirting boards that were never installed. A smoke alarm that hasn’t been signed off. No amount of scrubbing fixes any of that, and treating it as a cleaning job just delays the real conversation with your builder.
The tell is usually simple: would this room be fine once it’s swept, or is something still missing underneath the mess? If you’re not sure what your contract actually covers here, Victoria’s domestic building consumer guide is worth ten minutes before you decide. Get that sorted first, then call in the cleanup.
Who’s on the hook for the waste: EPA duty and council limits

Once you’ve worked out it’s genuinely mess and not a defect, there’s a practical question: who’s responsible for getting rid of it? Under Victorian law, whoever generates or holds waste has a duty to manage it properly, and that includes renovation and demolition waste like plasterboard offcuts, timber, packaging and general site rubbish. In practice, your contract should say whether the builder’s clean covers full removal or just a broom-through, so check that before assuming it’s on them.
Council hard rubbish isn’t the answer here either. Kerbside collections are built for household items, not builder’s waste, and most inner-Melbourne councils cap what they’ll take and won’t touch construction material at all. If you’re relying on a scheduled hard rubbish pickup to clear a renovation site, you’ll likely find half of it left on the nature strip.
This is really where post construction cleanup stands on its own: it’s a specific job, distinct from both general household rubbish and the builder’s contractual obligations, and it needs someone set up to take mixed building waste properly rather than a once-a-year council collection.
When the builder won’t come back: the dispute pathway
If the mess is really unfinished work, cracked render, doors that don’t close, a wet area that was never waterproofed, that’s not a cleanup job, it’s a defect. And if your builder has stopped answering calls altogether, no amount of tidying the site changes that.
In Victoria, that’s a matter for Consumer Affairs Victoria’s domestic building process, not a rubbish removal quote. Start by reviewing your contract obligations against the domestic building consumer guide, then lodge a formal complaint if the builder won’t engage.
We’d rather tell you that honestly than take a booking that doesn’t actually solve your problem. Once the dispute’s sorted and it’s genuinely time for a post construction cleanup, that’s exactly where we come in.
Key takeaways
Sorting the situation comes first. A messy site after a normal handover just needs a post construction cleanup, and that’s a booking, not a battle. Unfinished or non-compliant work is different: that’s a matter for Consumer Affairs Victoria’s domestic building complaint process, and a rubbish removal quote won’t fix it. Check your contract obligations first. Once any dispute’s resolved and it’s genuinely just mess left behind, give us a call and we’ll sort it.
Frequently Asked Questions
Look at what’s left behind, not just how much of it there is. Offcuts, packaging, dust, leftover tiles and general site rubbish are mess, completely normal after a build or renovation, and exactly what post construction cleanup is for. A defect is different: it’s work that’s incomplete, done incorrectly, or not up to the approved plans, like a door that doesn’t close, waterproofing that wasn’t finished, or render that’s cracking. If you’re looking at rubbish and offcuts, book a cleanup. If you’re looking at the work itself and something’s wrong with it, that’s a defects conversation with your builder, not a rubbish job.
First, put your concerns in writing (email is fine) so there’s a clear record and a reasonable deadline for a response. If you still hear nothing, Consumer Affairs Victoria is your starting point, they handle disputes between owners and builders in Victoria. For matters that need a formal ruling, the Domestic Building Dispute Resolution Victoria (DBDRV) service is the next step. We’re honestly not the right call for this part, our team is your call once the site itself just needs clearing and cleaning.
It’s best to wait until practical completion, or at least until the areas you want cleaned are genuinely done. Booking too early usually means we’re back a second time once more work happens, which costs you twice. If only part of the site is finished, tell us which rooms or areas when you book and we’ll quote around just that space.
Offcuts, packaging, dust sheets, leftover tiles and timber, empty paint tins, general site debris, and anything else the trades have left on site. We sort what can be recycled or donated from what’s genuinely rubbish, and we won’t touch anything that looks like it’s still part of the job, like leftover materials your builder might need. If you’re not sure what’s rubbish and what’s not, flag it when we quote and we’ll talk it through with you.
We’re not building inspectors and won’t sign off on the quality of anyone’s work. But we’ve cleared enough sites across Prahran, Toorak and the inner-east to know what a normal handover looks like, and if something seems off, we’ll say so honestly rather than staying quiet. That’s not a substitute for a proper building inspection, just an honest observation from people who’ve seen a lot of finished sites.



